Ship’s Log: 1/18/13

Posted on Jan 18, 2013

Making progress

Today, the new air filter, two new LED deck lights, and two new batteries were installed. The old arrangement for the batteries was a nightmare. They were installed in a fiberglass box with a lid that wasn’t secured, so it slid around. Also, if you ever wanted to remove them or let alone service them, because they were lead acid batteries, you had to lift them in an awkward way, over the top of the box to slide them out. Bad idea……….

IMG_0175


New LED deck lights